Shanghai,China
2020 官网升级中!现在您访问官网的浏览器设备分辨率宽度低于1280px请使用高分辨率宽度访问。
The basketball arena was built on top of a parking lot with a total construction area of about 2020 square meters. Considering the impact of coastal typhoons and wind, the calculation of mechanics, roof bearing capacity, wind resistance level, construction technology and other considerations were thoroughly discussed and studied, and finally the project was completed in 1 month from the start of construction. In addition, a variety of support facilities were also completed, including strength room, physical therapy room, locker room, etc. and are all connected to the main building, forming two areas of training and function.