2020 官网升级中!现在您访问官网的浏览器设备分辨率宽度低于1280px
请使用高分辨率宽度访问。

Shanghai Swimming Training Hall

Project Introduction

This swimming pool project is an aluminum alloy structure that is more corrosion resistant than steel structures. The surrounding area of the project is made of 50mm thick rock wool color steel plate, and the top is made of double layer thermal insulation film to ensure indoor constant temperature.

Related Cases

More Infomation

You can contact us through the following methods and we will provide you with feedback as soon as possible

USA

+1 (513) 331 2658

Asia

+86 800-820-6030

E

info@roder-architecture.com
Message